Building with unclear ROI
Eighteen months of roadmap and real spend, and nobody can point at the number it moved.
Expert data and AI advisory for logistics operators, from warehousing to delivery and installation.
Free, 30 minutes. Bring one thing that's stuck.
This is for you if...
A shipment has one status in the warehouse system, another in the carrier portal, and a third in the report your customer is reading.
Delivery and installation run on separate schedules, so a missed slot only surfaces when the crew is on site.
Landed cost gets worked out after the fact, so you find out which lanes lost money a quarter late.
Every new supplier, site or lane is onboarded by hand, and the integration takes longer than the contract did.
The same five failures, in roughly the same order, across every operator we have worked with.
Eighteen months of roadmap and real spend, and nobody can point at the number it moved.
The warehouse, the carrier and the finance system each hold a different figure for the same shipment, and reconciling them is somebody's Monday morning.
Delivered, in stock and lead time each mean something different depending on the system, so planning runs on numbers that were never the same number.
Your install crew is here but the delivery never came.
Checking with the carrier now
Order 4471 never reached the supplier. Install is Thursday.
Re-sent. Thursday still holds.
An order never reaches the supplier and an install crew arrives to a delivery that never came, and no alert fires on either one.
Every new supplier, site or lane queues behind a roadmap you do not control.
The checkpoint call decides which of these you actually need.
Every supplier order placed by hand, all day
Quick-commerce operator, 200+ warehouses
A quick-commerce operator running over 200 warehouses was placing every supplier order by hand: thousands a week, built in spreadsheets and sent by email, with reconciliation beyond capacity. The commercial operations platform was extended with a direct supplier connection in less than a month, through an integration provider we specified and selected. Orders, confirmations and delivery notes now move between their systems and their suppliers' automatically, and match against invoices without rekeying.
Start with a free call. From there we either run a full value iteration on your stack and hand you the plan, or we stay on as your fractional CTO for data and AI.
Free, 30 minutes
Bring one thing that's stuck. We tell you what's wrong with it and what to do first.
Book a checkpointScoped engagement, one-off
We analyse your whole stack and build a pragmatic plan: what's broken, what to fix first, and who should own it. Your team or any vendor you hire can run it.
Ongoing, fractional
We work with you a few hours a week on what moves the strategy: prioritisation, vendor calls, architecture decisions and hiring.
You get a senior technical decision-maker for a few hours a week, without the hire. In practice that means deciding what to build and in what order, choosing between tools and vendors, setting how your data is modelled, and unblocking the decisions your team cannot make on its own. Your integrators and your software vendors keep doing their work. We make sure it is pointed at the right thing.
They execute, and we work out what is worth executing. A 3PL runs what it is given, a forwarder moves what it is handed, and a WMS vendor ships what is on its own roadmap, so none of them owns whether your data model holds up across all three or whether your sequence is right. That is the gap we cover. We take no commission from any vendor, so the recommendation is just the recommendation.
Usually both, and the order matters. Nearly every mismatch we have traced came down to two systems holding the same field under different definitions, with no owner for either. Delivered might mean the dock scan in the warehouse system, the carrier marking the leg complete in transport, and a signed proof of delivery in finance. All three are defensible on their own terms, which is why the argument never resolves. Integrations built on top of that only move the disagreement around faster. We find where each record is actually authored first, give it one owner, then decide what to connect.
By specifying it tightly and buying the connectivity instead of building it. The long projects we see go long because nobody wrote down what the connection had to do before work started, so the scope kept moving. Once the message set, the matching rules and the ownership are settled, the integration itself is a well-understood piece of work and there are providers who do it for a living. We have taken a quick-commerce operator from fully manual spreadsheet ordering to live supplier integration in under a month that way.
Only once the data underneath it is modelled properly. Planning failures in supply chain usually come from supplier lead times, receipts and shortages being recorded inconsistently across systems, and from lead time meaning four things. A better model on that data produces confident wrong answers. Fix the data estate and a fairly ordinary forecast starts working.
It is usually the best time. A rollout is the one moment the business is willing to revisit its definitions, and moving broken master data onto a new system buys you the same problems with a new invoice. We have come in mid-rollout more than once, and the work mostly pays for itself in what does not get carried over.
We specify it, sequence it, and stay close while it gets built. The building is done by your own team or by a vendor you choose. Staying close means we write the specs, sit in the vendor calls, review what comes back against what was asked for, and re-sequence when something turns out harder than it looked. That keeps you able to drop us and keep going, which is the point.
We are based in Cyprus and work across Europe and the Gulf, and with teams operating in the US. Most of it happens remotely, with time on site where it earns its place.